无砟轨道旭普林机械设备转线及支脚安装调试

The line change of Xupulin mechanical equipments and the installment and trial run of scaffolds for non-stone tracks
下载PDF
导出
摘要 介绍了在郑西客运专线无砟轨道施工中采用了旭普林机械施工方法,就机械法施工工艺中旭普林机具设备的转线准备工作及支脚安装调试做一简单的阐述,从而确保线路铺轨后的平顺性。 It introduces the application of Xupulin mechanical construction method in the construction of non-stone tracks in Zheng-Xi passenger private line,illustrates briefly the prepare work of the line change of Xupulin mechanical equipments and the installment and trial run of scaffolds,so as to make sure the smoothness of tracks after the rails were paved.
作者 平旭辉
出处 《山西建筑》 2010年第18期288-289,共2页 Shanxi Architecture
关键词 无砟轨道 设备转线 支脚安装 支脚调试 non-stone track the line change of equipments the installment of scaffolds trial run of the scaffolds