三峡-葛洲坝梯级电站两坝间水位优化控制研究及效益分析 被引量:6

Optimized control on water level between Three Gorges dam and Gezhouba dam and its benefit analysis
原文传递
导出
摘要 针对三峡-葛洲坝两坝间水位控制对梯级电站发电量影响的问题,以日为单位,以单台机组为调度单元,建立了基于梯级电站发电精细模拟的三峡-葛洲坝日优化调度模型,运用模型进行大量模拟计算,分析了在三峡水库不同运行水位、不同出库流量下两坝间水位变化对梯级电站发电量影响的规律,得出了最优水位控制表。采用多年平均来流资料进行估算,水位最优控制下梯级电站年多增电量达12亿kW·h。 This paper develops an optimal daily scheduling model of Three Gorges-Gezhouba reservoirs,aiming at the control of river water level between the Three Gorges dam and the Gezhouba dam for a higher cascade power generating capacity.This model is based on an accurate simulation of cascade power generation with a single unit used as the dispatch unit.Through analyzing a large volume of simulation data,relationships are established between the water level change and the generation capacity under different flow releasing conditions of the Three Gorges project,and a chart of optimal water level control is obtained.The simulation results based on the long-term mean runoff show that under the optimal control the cascade power generating capacity totals 106.97 billion kWh or 1.22 billion kWh more than without control.
出处 《水力发电学报》 EI CSCD 北大核心 2010年第3期11-17,10,共8页 Journal of Hydroelectric Engineering
基金 "十一五"国家科技支撑计划"特大型梯级水利水电工程安全及高效运行若干关键技术研究"重点项目(20073338900)第九课题(2008BAB29B09)"三峡-葛洲坝梯级水利枢纽调度技术集成及示范"
关键词 水电工程 葛洲坝 优化调度 水位控制 效益分析 hydropower engineering Gezhouba dam optimal scheduling control of water level benefits analysis
  • 相关文献

参考文献3

  • 1薛金淮.关于水能计算中K值的探讨[J].电网与水力发电进展,2008,24(3):27-29. 被引量:21
  • 2CAO Guangjing, CAI Zhiguo, LIU Zhiwu, etc. Daily optimized model for long-term operation of the Three Gorges-Gezhouba cascade power stations[ J]. Science in China Series E:Technological Sciences:Science in China Press,2007.3 -13.
  • 3水利部长江水利委员会,中国长江三峡工程开发总公司,国务院三峡工程建设委员会.三峡(初期运行期)-葛洲坝水利枢纽梯级调度规程[R],2006,9.2.