摘要
通过工程实例,说明了如何采用新老地形图岸边线的比较以及实测岸边线与老地形图岸边线的比较来分析河道变迁范围的可行性。
This paper explains the feasibility of adopting the comparison of new topographic map's coastline and old topographic map's coastline and the comparison of measured coastline and old topographic map's coastline to analyze the bound of riverway vicissitude based on engineering projects.
出处
《科技情报开发与经济》
2010年第15期163-165,共3页
Sci-Tech Information Development & Economy
关键词
地形图
岸边线
变迁范围
topographic map
coastline
bound of riverway vicissitude