摘要
介绍了我国第一个直流输电工程现场调试情况。讨论了系统起动时投入旁路对(BPP)产生的反极性高电压和由此引起的误触发而造成起动失败的原因。
The on site test of the first HVDC project in China is introduced.The opposite polarity overvoltage caused by BPP when the system starts up and the subsequent mistriggers as well as the causes of resulting start failure are discussed
出处
《高压电器》
CAS
CSCD
北大核心
1989年第2期26-32,共7页
High Voltage Apparatus