期刊文献+

运载火箭研制经费估算方法 被引量:1

Research on Development Cost Estimation for Launch Vehicle
下载PDF
导出
摘要 运载火箭研制经费估算和管理是型号研制的重要组成部分。提出运载火箭的3步经费估算方法,首先利用层次分析法确定经费估算范围;然后根据型号研制的具体情况筛选技术参数,利用偏最小二乘法和基于主成分的神经网络法确定经费的预测基准;最后利用数学规划方法对两种方法的估算结果进行综合修正和优化。 Cost estimation and management plays an important part in launch vehicle development.A three-stage estimation method is given.Firstly,general range of research cost is estimated by analytical hierarchy process(AHP).Then,the PLS model and the back propagation neural network model based on principal component analysis are respectively established to predict the basic value of research cost.Finally,the results above are revised and optimized by mathematic programming method.
出处 《导弹与航天运载技术》 北大核心 2010年第3期20-23,共4页 Missiles and Space Vehicles
关键词 运载火箭 经费估算 层次分析法 神经网络法 Launch vehicle Cost estimation Analytical hierarchy process Back propagation neural network
  • 相关文献

参考文献4

  • 1Saaty T L. The analytic hierarchy process[M]. New York: McGraw Hill, Inc., 1980.
  • 2吴琼,原忠虎,王晓宁.基于偏最小二乘回归分析综述[J].沈阳大学学报,2007,19(2):33-35. 被引量:47
  • 3Charles W L. Training feed forward neural networks: An algorithm giving improved generalization[J]. Neural Networks, 1997.
  • 4胡运权,运筹学教程[M].北京:清华大学出版社,2000.

二级参考文献6

共引文献52

同被引文献8

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部