摘要 该文介绍了花岗岩分布区,在其残积层及风化带中常发育有球状风化体(孤石),给钻(冲)孔灌注桩的成孔施工带来了极大的困难,增大了工程成本,延误了工期。为了降低钻(冲)孔灌注桩的施工难度和成本,缩短工期,对桩端具有足够大直径"孤石"的基桩按扩底桩的原理作了优化设计。通过工程实例对该方法进行了验证,结果说明是可行的。 This paper introduces the granite areas, where globale weathered rock mass (solitary stone) often develops in the residual soil and weathered zone. This has brought great difficulty in cast-in-place piles formed by drilling (percussion), which augments project cost and delays time limit for the project. To lower the cost and shorten time limit as well as construction difficulty caused by cast-in-place formed by drilling (percussion), an optimization design, based on the principle of belled pile, has been made for the foundation piles of the pile end having the enough large-diameter'solitary stone'. The method is proved by the engineering cases, and the result makes clear that it is feasible.
作者 郑利松
出处 《城市道桥与防洪》 2010年第6期173-175,共3页 Urban Roads Bridges & Flood Control
关键词 球状风化体 孤石 扩底桩 优化设计 广州 globate weathered rock mass, solitary stone, belled pile, optimization design
  • 相关文献

参考文献4

  • 1地基及基础(新一版)[M].北京:中国建筑工业出版社,1991.
  • 2编写委员会.工程地质手册(第四版)[M].北京:中国建筑工业出版社,2007.
  • 3JGJ 94-2008,建筑桩基技术规范[S].
  • 4JTGD63-2007,公路桥涵地基与基础设计规范[S].

共引文献1585

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部