期刊文献+

桥梁的局部维修加固工艺与控制 被引量:2

Partial Maintenance Reinforcing Technology and Control of Bridge
下载PDF
导出
摘要 某城市桥梁为预应力混凝土简支空心板结构,运营10a后出现了支座下墩身开裂、梁体裂缝等病害。该文简要介绍了加固方案的选择。具体介绍了加固施工的方法和工艺要求,从而使桥梁结构加固达到预期的目的,延长了桥梁的使用年限。 An urban bridge is the prestressed concrete simple-supported hollow plate structure. The diseases of lower pier cracking of support and the beam crack occur after the bridge was put into operation for 10 years. The article briefly introduces the selection of reinforcing scheme and introduces in detail the reinforcing construction method and technological requirement to guarantee the reinforcing of bridge structure reach the expected objective and prolong the service life of bridge.
出处 《城市道桥与防洪》 2010年第6期178-181,共4页 Urban Roads Bridges & Flood Control
关键词 市政桥梁工程 局部损伤 维修加固 工艺控制 municipal bridge engineering, partial, maintenance and reinforcing, technological control
  • 相关文献

参考文献4

  • 1JTG/TJ22-2008,公路桥梁加固设计规范[S].
  • 2JGB 50367-2006,混凝土结构加固设计规范[S].
  • 3JTG/TJ23-2008,公路桥梁加固施工技术规范[S].
  • 4JTGH11-2004.公路桥涵养护规范[S].[S].,..

共引文献581

同被引文献8

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部