摘要 This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improvement at a catchment scale. The experimental field-scale wetland systems (four sets, 0.88 ha each) have been in operation since 2002, where water depth was maintained at 30-50 cm and hydraulic loading rate was at 6.3-18.8 cm/day. The wetland system was found to be adequate for treating polluted stream water with stable removal efficiency even during the winter. The integrated modeling system (modified-BASINS) was applied to the Seokmoon estuarine reservoir watershed and calibrated with monitoring data from constructed wetland, stream, and reservoir. The calibrated integrated modeling system estimated that constructing wetlands on 0.5% (about 114 ha) of the watershed area at the mouth of reservoir could reduce 11.61% and 13.49% of total external nitrogen and phosphorus loads, respectively. It also might improve the nitrogen and phosphorus concentration of the reservoir by 9.69% and 16.48%, respectively. The study suggested that about 0.1%-1.0% of the watershed area should be allocated for constructed wetland to meet specified water-quality standards for the estuarine reservoir at the polder area where land use planning is relatively less complicated. This article describes the integrated modeling approach for planning the size and the operation of constructed wetlands for maximizing retention of nonpoint source pollutant loads and reservoir water-quality improvement at a catchment scale. The experimental field-scale wetland systems (four sets, 0.88 ha each) have been in operation since 2002, where water depth was maintained at 30-50 cm and hydraulic loading rate was at 6.3-18.8 cm/day. The wetland system was found to be adequate for treating polluted stream water with stable removal efficiency even during the winter. The integrated modeling system (modified-BASINS) was applied to the Seokmoon estuarine reservoir watershed and calibrated with monitoring data from constructed wetland, stream, and reservoir. The calibrated integrated modeling system estimated that constructing wetlands on 0.5% (about 114 ha) of the watershed area at the mouth of reservoir could reduce 11.61% and 13.49% of total external nitrogen and phosphorus loads, respectively. It also might improve the nitrogen and phosphorus concentration of the reservoir by 9.69% and 16.48%, respectively. The study suggested that about 0.1%-1.0% of the watershed area should be allocated for constructed wetland to meet specified water-quality standards for the estuarine reservoir at the polder area where land use planning is relatively less complicated.
出处 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2010年第6期834-839,共6页 环境科学学报(英文版)
关键词 constructed wetland estuarine reservoir integrated modeling system nonpoint source pollution control polder area water quality improvement constructed wetland estuarine reservoir integrated modeling system nonpoint source pollution control polder area water quality improvement
  • 相关文献

参考文献18

  • 1Ambrose R B,Wool T A,Martin J L,1993.The Water Quality Analysis Simulation Program,WASP5 version 5.10.Part A:Model documentation.U.S.Environmental Protection Agency,Office of Research and Development,Environmental Research Laboratory,Athens,GA,USA.
  • 2Arheimer B,Wittgren H B,2002.Modeling nitrogen removal in potential wetlands at the catchment scale.Ecological Engineering,19:63-80.
  • 3Bicknell B R,Imhoff J C,Kittle J L,Donigian A S,Johanson R C,2001.Hydrological Simulation Program-FORTRAN (HSPF):User's manual for release 12.U.S.Environmental Protection Agency,Environmental Research Laboratory,Athens,GA,USA.
  • 4Carleton J N,Grizzard T J,Godrej A N,Post H E,2001.Factors affecting the performance of stormwater treatment wetlands.Water Research,35:1552-1562.
  • 5Cooke G D,Welch E B,Peterson S A,Newroth P R,1993.Restoration and Management of Lakes and Reservoirs (2nd ed.).CRC Press,New York.
  • 6EPA,2001.Better Assessment Science Integrating Point and Nonpoint Sources (BASINS) Version 3.0 User's Manual.EPA 823-8-01-001,Office of Water,Washington DC,USA.
  • 7Gumbricht T,1992.Tertiary wastewater treatment using the root zone method in temperate climates.Ecological Engineering,1:199-212.
  • 8Ham J H,2005.Nonpoint Source Pollution Control Using Constructed Wetlands and Integrated Watershed Modeling.Ph.D Thesis.Konkuk University.Seoul,Korea.
  • 9He C,Shi C,Yang C,Agosti B P,2001.A windows-based GIS-AGNPS interface.Journal of the American Water Resources Association,37:395-406.
  • 10Kadlec R H,Knight R L,1996.Treatment Wetlands.CRC Press,FL,USA.

同被引文献118

引证文献7

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部