地铁十字交叉换乘车站全暗挖同步建造技术 被引量:13

Simultaneous Mining Construction Technology for Cross Interchange Subway Stations
下载PDF
导出
摘要 从北京地铁黄庄站工程特点及建设条件影响分析入手,阐明采用全暗挖法技术在复杂环境条件下同步建造十字换乘车站的必要性,并就一次扣拱暗挖逆作法、暗挖交叉节点结构形式、暗挖进洞、环境保护及风险控制等暗挖关键技术进行阐述。 In the paper,through analyzing the features and construction conditions of Huangzhuang Station project on Beijing subway,the need for simultaneous construction of the metro station under complex environmental conditions by full tunneling method is illustrated. The key technologies for underground construction are explained,including top-down excavation with one-step casted arch,mining excavation with cross joint structure,mining excavation to enter into the station main tunnel as well as environment protection and risk control.
作者 黄美群
出处 《都市快轨交通》 2010年第3期75-80,共6页 Urban Rapid Rail Transit
关键词 城市轨道交通 地铁车站 十字交叉换乘 暗挖车站 一次扣拱暗挖逆作法 环境保护及风险控制 暗挖交叉节点 暗挖进洞 黄庄站 urban rail transit subway station cross interchange mining excavation station top-down excavation with once-step casted arch cross joint environment protection and risk control cross joint by underground construction tunnelling with underground construction Huangzhuang Station
  • 相关文献

参考文献4

二级参考文献1

  • 1北京城建设计研究总院.北京地铁四号线、十号线工程黄庄站施工图文件[G],2003-2005.

共引文献23

同被引文献42

引证文献13

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部