三峡永久船闸金结安装研究

Metal structure installation of Three Gorges shiplock
全文增补中
导出
摘要 三峡双线五级船闸水头113m单级最高工作水头45.2m,闸室有效尺寸280m×34m×5m。共设人字门24扇,总重20000t,预计整体调试时间长达1年之久,安装时间将不足两年。影响工期的制约因素是门体吊装和运输,而决定安装质量的是门体焊接变形控制。第二闸首人字门安装是关健,有就地顶升法和浮式移位法。后者可使底坎混凝土浇筑时间缩短20天,移位操作时间缩短12天,停航时间缩短62天。 The Three Gorges double - way and five - step shiplock will operate under a max. head of 113 m equipped with 24 miter gates weighing 20 000 t, and a clear chamber size of 280m × 34m × 5m for each step. The trail tests for the integrated metalstructures will take more than one year, but the installation will take less than two years. The factor controlling the construction schedule will be the transport, lifting and erection of the gates. The weld deformation control of gates will have decisive impact on the installation quality. The installation of the gate at the lock head N0. 2, the critical procedure, will be completed by the process of jack lifting or floating - displacement. By the latter process, the concrete placement time for stills may be reduced by 20 days, the displacement operation time reduced by 12 days and the navigation suspension reduced by 62 days.
作者 王守运
出处 《中国三峡建设》 1999年第1期22-24,共3页 China Three Gorges Construction
关键词 永久船闸 金属结构安装 人字门 方案优化 <Keywoeds> Three Gorges permanent shiplock Metal installation Miter gate Scheme optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部