混凝土纵向围堰拆除爆破减振措施及效果研究

Study on Vibration Damping caused by Explosive Demolition of Longitudinal Concrete Cofferdam
下载PDF
导出
摘要 提出了混凝土纵向围堰拆除爆破一种新的减振措施,即"预先形成减振带、靠近保护对象区域的炮孔底部设置柔性垫层"的减振措施。通过理论分析和数值仿真计算表明,减振带的设置,增强了对爆破应力波的反射作用,从而产生隔振效果,减振效果达到75%以上。研究成果成功运用于东坪水电站和株溪口水电站混凝土纵向围堰拆除爆破工程中。 A new measures, preshaping vibration damping zone and installing flexible layer on borehole foot near to protective objects, of controlling blasting vibration caused by demolishing longitudinal concrete cofferdam was proposed. Through the theoretical analysis and numerical simulation ,the results show that the vibration damping zone enhances the reflection of explosion stress wave,and the effect of vibration damping exceed 75 percent, which was applied successfully to demolish longitudinal concrete of Dongping and Zhuxikou hydropower station.
出处 《爆破》 CSCD 北大核心 2010年第2期92-95,105,共5页 Blasting
关键词 拆除爆破 爆破振动 混凝土纵向围堰 减振带 explosive demolition blasting vibration longitudinal concrete cofferdam vibration damping zone
  • 相关文献

参考文献2

二级参考文献7

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部