摘要 全面介绍了复杂条件下的地铁地面车站改造及新建地下换乘大厅的结构设计,包括对汽车等效均布荷载、非荷载作用和地下室顶板作为上部结构嵌固端的处理,对"建桥合一"的结构采用三维空间有限元计算分析,为地铁车站的结构改造设计提供了重要的参考。 The reconstruction of metro ground station and structural design of newly-constructed underground traffic-transfer hall under a complex condition are introduced,including vehicle equivalent uniform load,non-load effect as well as Embedded end Fixation of basement top board as superstructure.Three-dimensional finite element was used to calculate and analyze 'building-bridge into one' structure to refer an important reference for structural reconstruction design of metro station.
作者 江向东
出处 《城市公用事业》 2010年第3期5-9,共5页 Public Utilities
  • 相关文献

参考文献7

  • 1GB50009-2001.建筑结构荷载规范[S].北京:中国计划出版社,2006.
  • 2TB10002.3-2005铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[s].北京:中国铁道出版社,2005.
  • 3GB50011-2001.建筑抗震设计规范[S].北京:中国建筑工业出版社.2008:19-24.
  • 4DGJ08-109-2004.城市轨道交通设计规范[S].上海,2003.
  • 5TB10002.1-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2005.
  • 6GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 7上海市建设委员会科学技术委员会,地铁一号线工程[M].上海:上海科学技术出版社,1999.

共引文献482

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部