摘要 以南京地铁2号线东延线盾构隧道下穿宁芜铁路工程为背景,通过有限元数值模拟,对错位D型便梁在盾构下穿铁路工程中的应用效果进行研究。结果表明:当列车以45 km/h的速度通过错位便梁时,便梁纵梁的应力及挠度均满足使用要求,使所防护的线路轨面变形在控制要求范围内,便梁能够对铁路线路进行有效保护。 The project of Nanjing metro Line 2(east extension) tunnelling,which crossed below the railway between Nanjing and Wuhu is introduced,the application effect of the offset D-type temporary beam in the tunneling crossing below railway is studied by using the finite element numerical simulation.According to the research results,when the train passes through the offset D-type temporary beam at a speed of 45 km/h,the stress and deflection of the longitudinal beam can meet the operating requirements and the deformation of rail surface can be protected by the temporary beam within the range of control requirements.Therefore,the D-type temporary beam can effectively protect the railway line.
出处 《城市轨道交通研究》 北大核心 2010年第6期35-39,共5页 Urban Mass Transit
关键词 盾构隧道 D型便梁 沉降控制 数值模拟 shield tunneling D-type temporary beam settlement control numerical simulation
  • 相关文献

参考文献7

二级参考文献10

共引文献43

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部