期刊文献+

伸缩节在膨胀套管作业中的应用 被引量:3

Application of expansion joints to expandable casing operation
下载PDF
导出
摘要 降低膨胀套管施工中的膨胀压力是膨胀套管补贴取得成功的重要保证。对于液压膨胀方式而言,较小的膨胀压力可以降低施工风险。通过对膨胀套管在井下膨胀过程中压力变化的分析,指出由于送入油管柱的重力的影响,造成初始锚定过程中存在无法克服的附加压力,提出利用伸缩节消除附加膨胀压力、提高锚定效果的方法。2口井的现场施工证明,在难以把握的膨胀管锚定阶段,也是膨胀压力最高的环节使用伸缩节,膨胀作业的压力与室内试验相比增加很少。伸缩节不仅能够降低膨胀作业过程中的最大压力,还能提高锚定效果,方便司钻的操作,特别适用于深井膨胀作业。 To decrease the expansion pressure during expandable casing operation is important to ensure successful expandable casing path.For hydraulic expansion,smaller expandable pressure could reduce operation risk.Through the analysis of the pressure variation of expandable casing during downhole expansion,it is put forward that the gravity of tubing string may lead to the additional pressure that is insurmountable during initial anchoring,expansion jonints could be used to remove additional expansion pressure and improve anchoring.Through field operation,the use of expansion joints at the stage of expansion casing anchoring that is difficult to master,i.e.the stage of the highest expansion pressure,the pressure during expansion increases less as compared to lab test.Expansion joints could not only decrease the maximum pressure during expansion,also improve anchoring effect.They are easy to operate,especially applicable to deep well expansion.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2010年第3期112-115,共4页 Oil Drilling & Production Technology
关键词 膨胀套管 伸缩节 膨胀压力 锚定 expandable casing expansion joint expansion pressure anchor
  • 相关文献

参考文献4

二级参考文献14

共引文献44

同被引文献37

  • 1邓元洲,陈平,张慧丽.迭代法计算油气井密闭环空压力[J].海洋石油,2006,26(2):93-96. 被引量:26
  • 2练章华,林铁军,刘健,乐彬,陈举芬,徐月霞,杨涛,张建设.水平井完井管柱力学—数学模型建立[J].天然气工业,2006,26(7):61-64. 被引量:43
  • 3赵金洲.实体膨胀管补贴技术研究新进展[J].石油钻采工艺,2006,28(4):17-19. 被引量:16
  • 4杨海波,冯德杰,滕照正,吴柳根.膨胀管套管补贴工艺及在胜利油田的应用[J].石油矿场机械,2007,36(5):75-79. 被引量:18
  • 5REICH M,OESTERBERG M,MONTES H,et al.Straight down to success:performance review of a vertical drilling system[C]// SPE Annual Technical Conference and Exhibition,5-8 October 2003, Denver, Colorado.
  • 6OCHOA D,PALACIO J, AKINNIRANYE G,et al.A fit for purpose combination of positive displacement motor and rotary steerable systems delivers a step change in drilling optimization in Tomoporo Field..A west venezuela case study[C]//SPE/IADC Drilling Conference and Exhibition, 17-19 March 2009,Amsterdam, The Netherlands.
  • 7SAZIDY M S,RIDEOUT D G,BUTr S D,et al.Modeling percussive drilling performance using simulated Visco-Elasto- Plastic Rock Medium[C]//44th U.S.Rock Mechanics Symposium and 5th U.S.-Canada Rock Mechanics Symposium,June 27- 30,2010, Salt Lake City, Utah.
  • 8MARKETZ F,WELLING R W F,VAN NOORT R H J,et al Expandable tubular completions for carbonate reservoirs[J] SPE Drilling & Completion, 2007,22 (1) : 39-45.
  • 9HEATHMAN J, HALLIBURTON, ARREDONDO E, et al.Enhanced cementing practices address unique issues found with solid expandable tubular applications[C]//SPE/IADC Drilling Conference,20-22 February 2007,Amsterdam,The Netherlands.
  • 10吴福源,魏增红,柳涛,张建华,赵广堂.实体膨胀管补贴修井技术在江苏油田的应用[J].石油钻探技术,2008,36(1):80-82. 被引量:10

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部