摘要
本文就富家矿采用细石胶结分段充填法进行了简要分析,采用铲运机出矿和充填,有效提高矿山机械化程度和劳动生产率,水泥用量减少,使充填费用和生产成本降低。
出处
《有色金属(矿山部分)》
1999年第1期14-18,共5页
NONFERROUS METALS(Mining Section)
同被引文献15
-
1王凤石,姚振巩.分段分条胶结充填采矿法的试验研究[J].有色金属(矿山部分),1989,41(3):1-6. 被引量:1
-
2岑佑华,余琳.丰山铜矿上向分段碎石胶结充填采矿法研究与实践[J].中国矿山工程,2006,35(2):1-3. 被引量:10
-
3Mitri H S, Khan U H. Design procedure for cemented fill for open stoping operations[J]. Min Sci Technol, 1991,12(1 ) : 37- 44.
-
4Chris H, Martel S J. Pit crater formation on Kilauea volcano, Hawaii [ J ]. Journal of Volcanology and Geothermal Research, 1998,86(1/2/3/4):1-18.
-
5Singh U K, Jain P N, Prasad M. Post-pillar behaviour at deep levels in a copper mine[J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1995,32(6) :585 - 593.
-
6Chen L J, Jiao D. Design procedure for cemented fill for open stoping operations [ J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1992,29(1):333 -343.
-
7Chen L J, Jiao D Y. A design procedure for cemented fill for open stoping operations [ J ]. Mining Science and Technology, 1991,12(3) :333 - 343.
-
8Xu R Y, Li L X. Application of a combined supporting technique with cable bolts and split friction bolts in fill stoping [J ]. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts, 1989, 26 ( 2 ) : 263- 267.
-
9Ergin A. Design aspects of cemented aggregate fill mixes for tungsten stoping operations [ J ]. Mining Science and Technology, 1984,1 (3) :209 - 214.
-
10Kawamoto T. Application of damage mechanics for analysing an underground opening problem [J].Material, 1986, 35 (392) :3 - 13.
-
1卢霞,周益龙,江飞飞,李强.凡口铅锌矿机械化分段凿岩分段充填法试验研究[J].采矿技术,2016,16(2):10-13. 被引量:2
-
2李启月,刘恺,李夕兵.基于协同回采的深部厚大矿体分段充填采矿法[J].工程科学学报,2016,38(11):1515-1521. 被引量:18
-
3许新启.分段充填采矿法充填体稳定性分析及控制[J].有色金属,2000,52(4):18-22. 被引量:7
-
4戴宏辉,刘金明,董泽振.铜绿山铜铁矿分段充填采矿法的试验研究[J].采矿技术,2007,7(2):1-2. 被引量:4
-
5王栋.分段采矿法采场稳定性分析[J].黑龙江科技信息,2013(15):100-100. 被引量:2
-
6李清望.分段充填采矿法在大岭矿的试验研究[J].有色矿山,1998(6):1-4. 被引量:1
-
7刘福春.广西高峰矿业公司深部矿体采矿方法的改进[J].工程设计与研究(长沙),1997(2):1-3.
-
8高士田.高效率低成本的分段充填法[J].有色矿山,1997(4):1-4.
-
9文武军,朱靖,王永春.分段充填法在极薄矿脉开采中的应用[J].采矿技术,2009,9(2):3-4. 被引量:4
-
10张志红,张永贵,范文录,廖九波.用沙坝矿采场顶板稳定性模拟分析[J].矿业工程研究,2012,27(1):13-17. 被引量:1