摘要 某西部水电站工程规模巨大,左右岸两侧各9台机组,每3台机组共用一个规模巨大的下游阻抗式调压室。本文通过对复杂输水系统下游调压室托马临界稳定断面面积的计算方法、控制工况选择及各影响因素分析、计算,最终确定合理的下游调压室稳定断面面积,为其它类似工程提供参考依据。 The left and right rank of large-scale hydropower project separately have 9 units,each 3 units share the large-scale downstream impedance surge chamber.By analyzing the computing method,the working condition selection and other influencing factors of the Thomas critical stable section area for the surge chamber in the downstream of complex water supply systems,the paper determines the rational stable section area of downstream surge chamber,which would provide reference for other similar projects.
作者 姜宏军 吕慷
出处 《东北水利水电》 2010年第6期23-25,共3页 Water Resources & Hydropower of Northeast China
关键词 下游调压室 托马临界稳定断面面积 影响因素 巨型水电站 downstream surge chamber Thomas critical stable section area influencing factor large-scale hydropower station
  • 相关文献

参考文献2

二级参考文献3

  • 1王树人,水力不稳定流,1987年
  • 2匿名著者,水力公式集.上集,1977年
  • 3陈鉴治,武汉水利电力学院学报,1957年,2期

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部