摘要
通过对煤矿工程类型组成、建设规模,以及煤矿工程建设与生产运行期间水土流失特点、水土流失治理措施等的调查研究,依据法律法规、产业政策、行业规划、技术标准等相关规定,提出煤矿工程水土保持基本准入条件10条、限批条件9条、缓批条件8条、6大水土流失类型区煤矿工程水土保持方案准入条件34条、须由主体设计进行修正的条件15条、须修改完善水土保持方案的条件2条,以及煤矿工程水土保持方案优先审批和暂缓审批的13条意见。
Based on investigation and research on coal mine project composition,occupation of land,its construction and production technology in connection with water and soil losses,allocation and transportation of waste,the characteristics of water and soil losses during the project construction and production,and the measures for water and soil losses,in light of the related laws,rules,industry policies,sector planning and technical norms,this research has put forward 10 basic items for permitted requirements,9 items for restricted approval,8 items for delayed approval with regard to soil and water conservation for coal mine.This research has also raised 34 permitted requirements items of soil and water conservation for soil and water conservation program of projects in different soil and water losses zones,15 items that require the revision of designing and 2 items that require revision and improvement of soil and water conservation program.Besides,13 items with regard to the priority and delayed approval of soil and water conservation program have also been raised in this research.
出处
《中国水土保持科学》
CSCD
2010年第3期93-98,共6页
Science of Soil and Water Conservation
基金
国家财政部
水利部2008专题"开发建设项目水土保持准入研究"(1260816153)
关键词
煤矿
水土保持
准入条件
coal mine
soil and water conservation
permitted requirement