摘要
从负摩阻力的定义出发,以某工程为实例,确定了中性点的位置,其结果与规范取值相符合,并分析了该工程中负摩阻力的影响。
According to the definition of negative skin resistance the
position of neutral point is determined based on a project, its result is in accord with one given in
the code. The influence of negative skin friction is also analyzed.
出处
《岩土工程技术》
1999年第1期34-36,共3页
Geotechnical Engineering Technique
关键词
桩基
负摩阻力
中性点位置
桩基设计
Pile foundation
negative skin resistance
position of neutral point