摘要
通过福州闽江毗岸的元洪城一期工程基坑支护及地下水控制的实践。
The first project of Yunhong city is near the Ming River.Upon the p ractice of the pit excavation in this project,presents the solution of retaining and underground water control during pit excavation in sand ground near river.
出处
《地质与勘探》
CAS
CSCD
北大核心
1999年第1期59-61,64,共4页
Geology and Exploration
关键词
砂土地基
水泥土搅拌桩
地下水控制
深基础支护
sand ground,near river,mixed-in-place cement s oil piles,retaining of deep excavation,control of underground water