摘要
北京市双榆树暗挖热力隧道长320m,完全采用水平井降水,共施工水平孔32眼,埋设水平滤水管1530m。开挖证实,降水效果显著,取得了良好经济和社会效益。
Water level lowering with horizontal filter wells is adopted in the construction of the 320m long underground excavated heat distribution tunnel at shuangyushu in Beijing. 32 horizontal holes are drilled and 1530m horizontal filter pipes are laid. It is proved that the effect of ground water level lowering is remarkable and good economical and social benefit is obtained.