无锡市桃花山垃圾填埋场渗沥液预处理工程采用UASB+MBR处理工艺,其处理规模为800 m3/d。介绍了工程流程、设计特点及设计参数。该工程已投入实际运行。
UASB and MBR process is adopted for leachate pretreatment of Taohuashan landfill in Wuxi City with a design capacity of 800 m3 /d.In this paper,the process scheme,design feature and parameters are presented.This project has been put into operation.