摘要
沈阳地铁保工街站为保证地铁施工期间上部道路的正常行车,在施工此车站中采用盖挖顺作法施工,并采用军便梁作为临时路面支撑系统。
To ensure normal working of the street subway construction,Shenyang subway stations Baogong Street station adopted cover and cut- bottom construction and used the military road beam as a temporary support system.
出处
《价值工程》
2010年第15期103-103,共1页
Value Engineering
关键词
地铁车站
盖挖顺作
临时路面
军便梁
土方开挖
结构施工
metro station
cover and cut-bottom
temporary pavement
military beam
earth excavation
structure construction