摘要
本文以衡阳市某宾馆深基坑开挖中护坡桩设计为例,通过理论分析与现场观测,介绍了护坡桩的动态设计方法。
In this paper,as a case of design of fender piles for deep pit excavation in Heng yang,based on theoretical analysis and the field observations,dynamic design method has introduced
出处
《建筑技术开发》
1999年第1期16-18,共3页
Building Technology Development