摘要
根据东阳市城市污水水质情况和脱氮除磷的要求,污水处理厂采用了CAST工艺,设计了合理的污水处理工艺流程、主要构筑物与设备,经过工程调试及运行效果比对,出水达到城镇污水处理厂污染物排放标准。
According to the Dongyang municipal wastewater treatment and water quality requirements of nitrogen and phosphorus removal,sewage treatment plants using CAST technology,design a reasonable sewage treatment process,the major structures and equipment,through project commissioning and operating results comparison the effluent reached municipal wastewater treatment plant discharge standard.
出处
《价值工程》
2010年第17期81-81,共1页
Value Engineering