摘要
叙述了胜利海洋钻井公司九号钻井平台原SCR系统中存在的问题,提出了改造方案。着重介绍改造后SCR系统的功能及主要构件──PCC和触发电路。
The problems existed in the original SCR system of No. 9 drilling platform owned by Shengli Offshore Drilling Co. are described and the reform scheme is put forward. The main parts-PCC and trigger circuit and its function of the SCR system after reformation is introduced with emphasis.
出处
《中国海洋平台》
1999年第1期30-32,共3页
China offshore Platform