期刊文献+

塔里木轮南奥陶系碳酸盐岩高压油气藏水平井及大斜度井欠平衡钻井技术 被引量:7

UNDER BALANCE PRESSURE DRILLING TECHNIQUES OF THE HORIZONTAL WELL AND HIGH ANGLE DEVIATED HOLE IN ORDOVICIAN CARBONATE ROCK HIGH PRESSURE RESERVOIRS IN LUNNAN REGION OF TALIMU BASIN
下载PDF
导出
摘要 塔里木轮南地区碳酸盐岩裂缝性油气藏地层压力系数与地层破裂压力系数相近,钻井液安全密度窗口小于循环压耗,钻井过程中井漏和溢流经常同时发生,无法进行正常钻进和起下钻作业。针对喷漏共存以及碳酸盐岩不能实现稳产等难题,通过对解放128水平井和轮古2大斜度井的欠平衡钻井实践,总结分析了水平井、大斜度井欠平衡钻井的准备及其相关钻井技术。采用了环空打一个重“泥浆帽”,关井,钻具内用清水作为冷却液边漏边钻,顺利地完成了一口造斜点5060m,斜深5750.30m(垂深5341.73m),水平段长259.47m的水平井;使用边喷边钻钻井工艺,成功地钻成了一口造斜点5102m,斜深5500m(垂深5368.13m),水平位移277.2m的大斜度井(井斜66°)。利用“吊罐”起下钻技术,解决了井漏情况下的换钻头、测斜、中测、电测、完井等作业。 In the fractured carbonate reservoirs in Lunnan region of Talimu Basin, the formation pressure coefficient and formation fracture pressure coefficient are similar to each other, the safety density window of drilling fluid is less than the circulating pressure loss, in drilling the lost circulation and overflow often happen at the same time, thus obstructing the normal drilling and roundtrip. In accordance with some difficult problems as the coexistence of the well blowout and lost circulation and that the stable production couldn't be realized in carbonate reservoir, the preparation and relevant drilling techniques of under balance pressure drilling of the horizontal well and high angle deviated well are summarized and analyzed through the under balance pressure drilling practice in the horizontal well Jiefang 128 and high angle deviated well Lungu 2. A horizontal well with a kickoff point of 5060 m, an oblique depth of 5750.30 m (a vertical depth of 5341.73 m) and a horizontal section length of 259.47 m was smoothly drilled through applying the following measures as making a heavy 'mud cap' around the annular space, shut in well and losing circulation while drilling by use of water as the cooling liquid in the drill string and a high angle deviated well with a kickoff point of 5102 m, an oblique depth of 5500 m (a vertical depth of 5368.13 m), a horizontal displacement of 277.2 m and a diviation angle of 66 。 was successfully drilled by use of the technique of blowing out while drilling. Through applying 'Hanging Jar' roundtrip technique, all the works as changing bit, slope measurement, drillstem test, wireline well logging and well completion have been finished under lost circulation condition.
出处 《天然气工业》 EI CAS CSCD 北大核心 1999年第2期63-68,共6页 Natural Gas Industry
关键词 塔里木盆地 奥陶纪 碳酸盐岩 高压 油气藏 钻井 Talimu Basin, Lunnan Oil Field, Ordovician period, Carbonate rock, High pressure reservoir, Horizontal well, High angle deviated hole, Drilling
  • 相关文献

同被引文献75

引证文献7

二级引证文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部