以大石峡水电站业主承包商营地规划建筑设计为例,在水电站建设过程及后期运营过程中,对如何创造出满足适合人居的生活环境进行了探讨,以期对未来水电站营地的建设发展提供一些借鉴。
Taking the planning and building design for the camp of the employer and contractor of Dashixia hydropower project for example, this paper discusses how to create a living environment for people during the hydropower project construction and later operation, and expects to provide reference for future camp construction for hydropower projects.
出处
《西北水电》
2010年第3期44-45,共2页
Northwest Hydropower
关键词
大石峡水电站
生活营地
人居环境
建筑设计
Dashixia hydropower project
living camp
living environment
building design