摘要 占化水电站施工总布置,主要施工工厂集中于一岸布置,减少施工工厂设施投资;选用水库淹没赔偿地作为主要的弃渣场地,减少土地征用;采用拦渣坝措施,既利用冲沟堆渣,又不妨碍冲沟泄水;生产区和生活区合理相隔,体现人性化管理。文章简单介绍占化水电站施工总布置情况。 The general construction layout of Chiem Hoa Hydropower Station is introduced.The construction plant is arranged on the left bank in an attempt to reduce investment on its facilities.Land as compensation for reservoir inundation serves as the spoil yard for the purpose of reducing land requisition.Debris retaining dam is built so that slag is stacked by making use of gully and water can be discharged in the gully.In addition,production area and living area are separated reasonably.
作者 刁树广
出处 《红水河》 2010年第3期7-11,共5页 Hongshui River
关键词 施工布置 施工工区 规划 占化水电站 construction layout construction area planning Chiem Hoa Hydropower Station