摘要
麻石水电站1号机组经过37年的运行,机组各部件老化严重,安全隐患较大,进行技术改造非常有必要,文章介绍了麻石水电站1号机组增容改造选型的方案及水轮机主要参数的选择。经过技术改造后,1号机的单机容量可提高至36.5 MW,比原机组增容30.3%。
Mashi Hydropower Station's 1# unit has aged after 37 years of service, and shall be provided with technical transformation.The scheme of capacity enlargement and transformation of 1# unit and selection of main parameters for the water turbine are discussed.The unit capacity of 1# unit adds to 36.5MW after technical transformation,an increase of 30.3% compared with the original capacity.
出处
《红水河》
2010年第3期18-20,28,共4页
Hongshui River
关键词
水轮发电机
改造
选型设计
麻石水电站
hydroelectric generating unit
transformation
type selection design
Mashi Hydropower Station