摘要
介绍了大化水电站扩建工程地质条件,并对扩建工程存在的边坡倾倒破坏、层间挤压破碎带、厂坝基渗漏等主要工程地质问题及其处理进行了论述。
This article introduces the engineering geological conditions of Dahua Hydropower Station Extension Project.Problems including slope toppling failure,layer compression facture zone,and dam base seepage and their solutions are discussed.
出处
《红水河》
2010年第3期40-43,共4页
Hongshui River
关键词
工程地质
倾倒破坏
层间挤压破碎带
置换
帷幕灌浆
大化水电站扩建工程
engineering geology
toppling failure
layer compression fracture zone
replacement
curtain grouting
Dahua Hydropower Station Extension Project