7CHRISTER A H, LEE C. Refining the delay-time based PM inspection model with non-negligible system downtime estimates of the expected number of failures [ J ]. International Journal of Production Economics, 2000, 67 ( 1 ) : 77285.
8CHRISTER A H, WALLER W M. Reducing production downtime using delay time analysis[J]. Journal of the Operational Research Society, 1984, 35 (6) : 499 - 512.