期刊文献+

辽宁省明长城测量项目作业流程及质量控制

Workflow and Quality Control of Ming Dynasty Great Wall Surveying Project in Liaoning Province
下载PDF
导出
摘要 随着"长城保护工程"的实施,长城资源调查成了"长城保护工程"的重要组成部分和实施基础,计划分明长城调查、秦汉长城调查和其他时代长城调查三个阶段,并于2010年完成。本文主要阐述了辽宁省明长城测量项目的工作要点及流程,并结合辽宁省明长城测量项目的生产实践,介绍了长城专题要素采集和长城长度测量的方法,以及其质量控制方法。 With the implementation of the Great Wall protection project,resources investigation becomes the important component and the base of the project including three phases:the Ming dynasty Great Wall investigation,the Qin and Han dynasty Great Wall investigation and the other dynasty Great Wall investigation which would be fulfilled in 2010.This paper mainly introduced the workflow and key points of Liaoning provincial Ming dynasty Great Wall surveying project,thematic data collection,length measurement method of the Great Wall,and its quality control method combining the practical production of the project.
作者 王宁 王青山
出处 《测绘与空间地理信息》 2010年第3期216-218,共3页 Geomatics & Spatial Information Technology
关键词 空三加密 长城专题要素 长城长度测量 质量控制 aerial encryption thematic elements of the Great Wall length measurement of the Great Wall quality control
  • 相关文献

参考文献2

二级参考文献5

  • 1国家测绘局,国家文物局.明长城测量总体技术方案[G].北京:2008.
  • 2国家测绘局,国家文物局.长城资源调查工作手册[G].北京:2007.
  • 3中华人民共和国国家质量监督检验检疫总局中国国家标准化管理委员会.1:5000、1:10000地形图航空摄影测量内业规范(GB/T13977-92)[S].北京:中国标准出版社,1992.
  • 4中华人民共和国国家质量监督检验检疫总局中国国家标准化管理委员会.数字测绘产品检查验收规定和质量评定(GB/T18316-2008)[s].北京:中国标准出版社,2008.
  • 5郭朝勇等编著.《AutoCADR14(中文版)二次开发技术》,北京:清华大学出版社,1999.4.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部