格形钢板桩码头结构加固改造方案研究──广州港新沙港区^#2,^#3泊位码头前沿水域浚深方案设计 被引量:4

Structure strengthening and reconstruction scheme of cellular steel sheet pile wharf:wharf apron deepening dredging scheme design of berths ^#2 & ^#3 of Guangzhou Xinsha Port
下载PDF
导出
摘要 结合广州港新沙港区#2,#3泊位码头前沿停泊水域浚深方案设计,从技术可行性、结构安全性以及改造方案的经济合理性和可操作性等方面入手,对格型钢板桩码头结构加固改造的设计思路和方法进行了系统的分析与比对研究,提出了一套关于格型钢板桩码头结构复核分析计算方法和改造加固方案,供业内同行参考。 Based on a systematic analysis and comparison of the design ideas and methods of strengthening and reconstruction of cellular steel sheet pile wharf structure from the feasibility of the technology,structural safety,as well as the reasonability of economy and operatability of the reconstruction scheme combining the deepening dredging scheme design of berths #2 #3 of Guangzhou Xinsha Port,we propose a set of analysis and calculation methods for the rechecking,strengthening and reconstruction scheme of cellular steel sheet piles.
出处 《水运工程》 北大核心 2010年第6期68-72,共5页 Port & Waterway Engineering
关键词 格形钢板桩 水域浚深 码头结构 加固改造 cellular steel sheet pile water area deepening dredging wharf structure strengthening and reconstruction
  • 相关文献

参考文献7

二级参考文献3

  • 1JGJ79—2002.建筑地基处理技术规范[S].[S].,2002..
  • 2朱志铎,经绯,张云.土质学与土力学[M].北京:建材工业出版社,2005.
  • 3刘正峰.地基与基础工程新技术实用手册[M].北京:海潮出版社,2006.

共引文献63

同被引文献24

  • 1左明福.广州港新沙港区格形钢板桩码头位移沉降观测[J].水运工程,1993(4):7-12. 被引量:2
  • 2张德果,毛铠.盐田港格型钢板桩码头结构设计[J].水运工程,1996(10):93-95. 被引量:6
  • 3JTJ 293-1998格形钢板桩码头设计与施工规程[S].
  • 4饶锡保,程展林,徐言勇.格形钢板桩码头侧向变形离心模型试验研究[C]∥物理模拟技术在岩土工程中的应用--中国水利学会2007学术年会论文集.北京:中国水利学会,2007:70-79.
  • 5DBJ 15-38-2005,建筑地基处理技术规范[S].
  • 6JTJ250-1998,港口工程地基规范[S].
  • 7周连有.格形钢板桩结构设计与模型试验研究[J].中国港湾建设,1987(1):11-18.
  • 8第一航务工程局援马耳他干船坞技术组.格形钢板桩围堰设计和施工总结[J].水运工程,1978(10):12-28.
  • 9交通部第一航务工程勘察设计研究院设计队援外组.关于格形钢板桩围堰的设计[J].港工技术,1977(4):41-67.
  • 10毛铠.格形钢板桩结构设计施工手册[M].北京:人民交通出版社.1999.

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部