脱硫系统与主机联控优化运行探讨

A Tentative Study on Operation Optimization of Joint Control between Main Generating Set and Desulfurization System
下载PDF
导出
摘要 通过对某发电厂2×130MW机组两炉一塔式脱硫系统投运前后烟气系统的分析,提出主机与脱硫系统联控运行方案,同时提出引风机与增压风机之间的节能运行优化思路,旨在提高主机与脱硫系统的安全、经济、稳定运行。 Through analysis of the flue gas of 2×130 MW unit in a power plant before and after the operation of the two-boilor-one-tower desulfurization system,the paper presents a joint control plan between the main generationg set and the desulfurization system and proposes a way of optimized energy-saving operation between draft fan and booster fan in order to improve safty,economy and stability operation of the main generating set and the desulfurization system.
作者 苏晓艳
机构地区 萧山发电厂
出处 《浙江电力》 2010年第6期30-32,36,共4页 Zhejiang Electric Power
关键词 脱硫系统 主机 联控 优化运行 desulfurization system main generating set joint control operation optimization
  • 相关文献

参考文献2

二级参考文献4

  • 1舒惠芬.脱硫工程后评估的必要性及对后评估工作的建议[J].中国电力,2005,38(11):66-68. 被引量:6
  • 2[2]周至样,段建中,薛建明.火电厂湿法烟气脱硫技术手册[M].北京:中国电力出版社,2006.
  • 3[3]Jerzy Warek,et.Optimum Values of Process Parameters of the "Wet Limestone Flue Gas Desulfurization System"[J].Chem.Eng.Technol.2002,25(4):427-432.
  • 4[4]R.W.Farmer,J.B.Jarvis and R.Moser,Effects of aluminum/fluoride chemistry in wet limestone flue gas desulfurization[J]].Chem.Eng.Comm.1989,77:135-154.

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部