摘要
介绍邹县三期工程中由中国东方电气集团公司供货的头两台600MW汽轮发电机组的有关情况,对该工程汽轮发电机组的特殊供货方式进行了分析和总结,并得出这种模式在今后仍将有其生命力的结论。
A summary for the project of Zouxian Power Plant Phase I is presented in this paper, in which the author give a detailed introduction to the technology and performance of the first two 600MW turbo-generator units supplied by Dongfang Electric Corporation. The reason for the project success as well as the special equipment supply mode for this project are discussed here with a conclusion that this mode will continue to have its vitality.
出处
《东方电气评论》
1999年第1期46-53,共8页
Dongfang Electric Review
关键词
汽轮发电机组
性能参数
发电机组
试验
Phase I of Zouxian Project 600MW turbo-generators Supply mode