摘要
本文研究了资源有限—工期最短的优化问题,提出了相应的分枝定界算法.
In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed.
出处
《系统工程》
CSCD
1999年第2期72-75,共4页
Systems Engineering