上海市轨道交通明珠线原铁路拆迁工程的工期优化管理 被引量:1

Optimizing Management of the Time Limit for the Removal Project of Shanghai UMT Pearl Line
下载PDF
导出
摘要 上海市轨道交通明珠线大部分线路位于原淞沪支线和沪杭内环线的铁路用地。阐述了此范围内各类铁路设施、建筑物、管线等拆迁工程的工期优化管理问题。如:节点提前开工的调整,减轻工序延误的影响,加强关键路线的管理,注意工期与费用的关系等。 Since a section of Shanghai UMT Pearl Line is constructed on the former Songhu(Wusong - Shanghai) Railway and Huhang(Shanghai - Hangzhou)Inner Line, the author attaches great importance to the optimizing management of the time limit of the removal project, which includes buildings, pipelines and other railway facilities within the former railway lines, and discusses the concrete steps concerning the arrangement of connecting operation before the due time, the reduction in the influence of a delayed working procedure, the reinforced management of key sections as well as the relation between the time limit and the cost of the whole project.
作者 葛方
出处 《城市轨道交通研究》 1999年第1期73-76,共4页 Urban Mass Transit
关键词 拆迁工程 工期管理 优化控制 城市轨道交通 UMT Pearl Line, railway removal project, management of the time limit of a project, optimizing op-eration
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部