摘要 在不良地质、浅埋地段隧道施工难度和风险极大,地表和洞身沉陷是施工中常见的一种事故。文章结合摇前隧道右线出口不良地质地段地表和洞身沉陷事故,对工程监控量测、应急处理、原因分析和整治处理方案及整治效果进行介绍,以期为类似事故的处理提供参考。 Construction difficulties and risk are enormous in bad geology and shallow sections, while surface and tunnel body subsidence is a kind of familiar accident in construction. According to the surface and tunnel body subsidence accident which happened in bad geological sections of the Yaoqian right tunnel exit, this paper introduces it's monitoring measurement, urgent disposal, cause analysis, renovating scheme and renovating effect. The research results could offer reference to the treatment of similar accidents.
作者 黄礼章
出处 《现代交通技术》 2010年第3期67-69,共3页 Modern Transportation Technology
关键词 隧道 洞身沉陷 应急处理 方案论证 施工 tunnel body subsidence urgent disposal scheme demcnstratiou construction
  • 相关文献

参考文献4

  • 1JTGD70-2004.公路隧道设计规范[S].[S].,..
  • 2JTJ042-94.公路隧道施工技术规范[S].[S].,..
  • 3王梦恕.浅埋暗挖法设计、施工问题新探[J].隧道建设,1992,12(2):1-7. 被引量:10
  • 4福建省高速公路建设总指挥部.福建省高速公路隧道施工标准化管理指南[M].北京:人民交通出版社 2010.

共引文献1155

同被引文献7

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部