期刊文献+

应用全站仪进行三角高程测量的新方法 被引量:1

New Method of Carrying Out Trigonometric Leveling by Using Total Station
下载PDF
导出
摘要 使用跟踪杆配合全站仪测量高程的方法越来越普及,传统的三角高程测量方法已经显示出了局限性。经过长期摸索,总结出一种新的方法进行三角高程测量。这种方法既结合了水准测量的任一置站的特点,又减少了三角高程的误差来源,同时每次测量时不必量取仪器高、棱镜高。使三角高程测量精度进一步提高,施测速度更快。 The method of survey height by using the tracking pole cooperating with the total station is becoming increasingly popular,the traditional trigonometric leveling method has shown its limitations.After long term feel about,sum up a new method of trigonometric leveling.This method not only combines the features of any one sets station of standard measurement,but also reduces trigonometric leveling error sources,while each time surveys does not need to take height of the instrument and prism.Makes the trigonometric leveling precision to further enhance,measuring speed is faster.
作者 吕建红
出处 《山西焦煤科技》 2010年第B07期56-57,共2页 Shanxi Coking Coal Science & Technology
关键词 全站仪 角高程 测量 新方法 Total Station Trigonometric leveling Survey New method
  • 相关文献

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部