摘要 考虑立井连续施工过程,从解析角度研究施工过程中的应力与位移。从一般粘弹时变力学方程出发,用拉普拉斯变换法寻找粘弹问题解与弹性问题解的对应关系,指出只有自相似粘弹时变问题才可获得这种对应关系。对于可模拟为Maxwell粘弹性体的岩体,仅考虑自重应力作用时,根据这种对应关系得到圆形立井施工过程应力和位移解析解,并分析了施工速度和围岩径向位移之间的关系。 For vertical shaft continuous construction, displacement and stress during construction are analyzed by using timevarying mechanics method. First, Laplace transform method is used in order to look for the relation between viscoelastic solutions and elastic solutions of time-varying problem. The research indicated that the corresponding relations are existed when boundary varying is self-similar. The format of boundary rune= tion of self-similar time-varying is presented also. Stress and displacement of vertical shaft during construction are obtained according to the corresponding relations in this paper, and relations of construction speed and displacement of r-direction is analyzed by the presented solution.
作者 王华宁
出处 《西部探矿工程》 CAS 2010年第8期7-10,12,共5页 West-China Exploration Engineering
基金 国家自然科学基金资助项目(编号:10702052)
关键词 立井 时变力学 粘弹性 解析 vertical shaft time-varying mechanics viscoelasticity analytical solutinty analytical solutin
  • 相关文献

参考文献11

  • 1焦春茂,吕爱钟.粘弹性圆形巷道支护结构上的荷载及其围岩应力的解析解[J].岩土力学,2004,25(z1):103-106. 被引量:20
  • 2刘保国,杜学东.圆形洞室围岩与结构相互作用的粘弹性解析[J].岩石力学与工程学报,2004,23(4):561-564. 被引量:47
  • 3Namov V. E. , Mechanics of growing deformable solids--A review[J]. J. of Eng. Mech. , 1994(2): 207-210.
  • 4Shamina V. A. Formulation of the linear axisymmetrie problem for deformable solids in terms of stresses [J]. Vestnik Sankt- peterburgskogo Universiteta. Ser 1. Matematika Mekhanika Astronomiya, 2001(1) : 145-148.
  • 5Georgiyevskii D V., Pobedrya B Ye , The number of independent compatibility equations in the mechanics of deformable solids[J]. J. of Appl. Math. And Mech, 2004, 68(6) : 941-946.
  • 6王华宁,曹志远.无限粘弹性平面中孔洞扩展的时变力学解析解[J].固体力学学报,2006,27(3):319-323. 被引量:11
  • 7Mana A I , Clough GW. Prediction of movements for braced cuts in clay. J of the Geotech Eng Div[J]. ASCE, 1981,107: 759-778.
  • 8Borja R I , Kishnani S S. On the solution of elliptic free2boundary problems via Newtonps method[J]. Comp Methods Appl Mech Eng. 1991, 88(3) :341-361.
  • 9Richard J F etc. Finite element anlysis of HDR24 excavation[J]. J of Geoteeh Eng Div. 1991, 117(10): 1590- 1609.
  • 10F. Hage Chehade, I. Shahrour. Numerical analysis of the interaction between twin--tunnels: Influence of the relative position and construction procedure[J]. Tunnelling and Underground Space Technology, 2008 (23): 210-214.

二级参考文献16

  • 1徐芝伦.弹性力学[M].北京:人民教育出版社,1982..
  • 2[5]张德培编著.流变力学原理及其在岩土工程中的应用[M].重庆: 西南交通大学出版社,1995.
  • 3[6]张玉卓译.岩层力学理论[M].合肥: 中国科学技术出版社,2001.
  • 4Rashba E I.Stress determination in bulks due to own weight taking into account the Construction Sequence.Proc Inst Struct Mech,1953,57(3):529~536
  • 5Brown C B,Green D R,Pawsey S.Flexible culverts under light fills.J Struct Div ASCE,1968,94(4):905~917
  • 6Christion P P,Chuntranuluk S.Retaining wall under action of accreted tack fill.J Geotech Engry Div ASCE,1974,100(4):471~476
  • 7Brown C B,Evans K J,Lachapelle E R.Slab avalanching and state of stress in fallen snow.J Geoghysical Res,1972,77(24):4570~4580
  • 8Namov V E.Mechanics of growing deformable solids-A review.J of Eng Mech,1994,(2):207~215
  • 9曹志远.时变力学及其工程应用[J].力学与实践,1999,21(5):1-4. 被引量:34
  • 10曹志远.时变固体力学的黏弹性解[J].力学学报,2000,32(4):497-501. 被引量:10