摘要
本文对数字化变电站和智能变电站进行了比较,介绍了智能变电站试点工程项目指标评价体系,就智能变电站建设中的定位、基本思路、原则、技术标准、技术成熟度、相关技术、管理模式等相关问题发表了想法和建议,为智能变电站试点工程的实施提供参考。
The paper compared digital substation and intelligent substation as well as presented index evaluation system of intelligent substation pilot project.Moreover,matters in intelligent construction such as location,idea,principle,technique standard,related technology and management were discussed to provide reference for intelligent substation pilot project.
出处
《江西电力》
2010年第3期1-5,9,共6页
Jiangxi Electric Power