摘要
简介广西长歧水利工程灌区概况,分析存在的问题,探讨其解决办法,指出解决长歧水利工程管理的问题,关键是国家相关政策的落实,地方政府的正确领导,以及基层管理单位积极参与和配合。
Based on brief introduction of the general conditions of Changqi Water Project located in Guangxi,the author analyzed the existing problems,probed into corresponding solutions,and put forward the keys to the project management problem include relevant policy being put into effect,correct leadership of local government,active participation and coordination of all basic administrative units.
出处
《广西水利水电》
2010年第3期82-84,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水利工程
灌区
问题
措施
Water project
irrigation zone
problem
measure