摘要
分析长兴县和平水库大坝渗流产生的原因,并对其采用粘土套井结合坝基帷幕灌浆防渗处理方法的设计和施工技术要点进行详细阐述.通过防渗效果分析,达到消除水库大坝安全隐患的目的,可为同类工程施工提供参考.
The seepage causes of Heping Dam in Changxing County are analyzed in detail in the article,in terms of dam foundation seepage,dam body seepage and dam abutment seepage.The design and construction techniques of clay backfill with curtain grouting are focused on in order to handle seepage-proofing.The reinforcement results fully illustrates the effect of the techniques,which provide a reference for similar construction.
出处
《浙江水利水电专科学校学报》
2010年第2期47-51,共5页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
和平水库
粘土套井
帷幕灌浆
除险加固
Heping Reservoir
clay backfill
curtain grouting
reinforcement