摘要
分析了郑西客专先行段GSM-R网络优化技术方案,主要包括网络覆盖优化、越区切换优化和网络优化及QoS调测中重点调整项目,可以为其他工程提供设计和实施参考。
This paper introduces and analyzes the optimization of GSM-R for Zheng-Xi Passenger Line First Section, including the optimization of the network coverage, the optimization of handover and the network, as well as the key adjustment items in QoS. It is hoped that it can be used as reference for other similar projects.
出处
《铁道建筑技术》
2010年第6期99-103,共5页
Railway Construction Technology
关键词
GSM-R
网络覆盖
网络优化
技术分析
GSM-R
network coverage
network optimization
technical analysis