期刊文献+

向莆铁路某特大桥施工挂篮的优化设计 被引量:1

Optimization Design of Certain Extra Large Bridge’s Movable Suspended Scaffolding over Newly Built Xiang-Pu Railroad
下载PDF
导出
摘要 在分析了某特大桥的工程特点的基础上,可设计挂篮法悬臂灌筑施工流程;根据桥身截面变化的特点,选定了四种典型工况,基于构件承载能力极限状态理论和满足结构构造要求、运用Midas2006软件并行处理,以平均应力发挥最大、结构质量最轻为目标,进行挂篮构件优化设计。该设计方法步骤简单、操作方便、理念先进、目标性强,具有广阔的应用前景。 Analyzing the characteristic of a certain extra large bridge, the author designed the construction process of movable suspended scaffolding. According to the difference of cross section of the bridge, the author selected four typical examples. In accordance with the limit equilibrium method for loading capacity of structural parts Midas2006 software was used for the treatment. With the target of utilizing the greatest function of average stress and lightest weight of structure, this method of design is simple, convenient, advanced, clearly aimed and has a broad application prospect.
作者 郑乾城
出处 《浙江工商职业技术学院学报》 2010年第2期33-35,54,共4页 Journal of Zhejiang Business Technology Institute
关键词 特大桥 挂篮 工况 模型 优化设计 certain extra large bridge movable suspended scaffolding typical working condition model optimization design
  • 相关文献

参考文献3

二级参考文献14

共引文献10

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部