摘要
针对某电机厂定子装配生产目前存在的生产效率低等问题,运用工作研究方法对其产生的原因进行了详细分析,并就车间平面布置、操作程序等问题提出了相应的改善方案。改进后定子装配生产线的生产节拍缩短了22.2%,搬运效率提高了30%。
A case study of redesigning a stator assembly line in an electric motor factory is conducted.The production line is analyzed by using work study techniques.Based on the analysis,the production process is redesigned by eliminating,combining,rearranging,and simplifying the activities such that the workload is balanced.Then,layout is redesigned to improve the material transportation.With the new design,the cycle time of the line is reduced by 22.2% and the transportation efficiency is increased by 30%.
出处
《工业工程》
北大核心
2010年第3期126-129,共4页
Industrial Engineering Journal