摘要
从提高防水混凝土施工的抗渗性角度出发,分别在防水混凝土施工准备阶段、施工过程和施工验收阶段进行了质量控制,指出只有严格按规范及操作规程的规定施工,才能有效确保防水混凝土的施工质量。
From the point of view of improving waterproof concrete's leakage-resistance. It carried on the quality control separately in the waterproofing concrete construction preparatory stage, the construction process and the construction acceptance phase. It points out that only when the standards and working instructions are strictly conducted by stipulation construction, the waterproof concrete's construction quality can be insured availably.
出处
《山西建筑》
2010年第20期215-216,共2页
Shanxi Architecture
关键词
防水混凝土
施工
质量控制
waterproof concrete, construction, quality control