摘要
以重庆国际会展中心市政工程隧道暗挖段为工程背景,介绍了暗挖段空箱挡墙处施工技术,通过施工技术措施的实施,确保了施工质量、进度、安全和经济要求,为类似工程积累了宝贵经验。
Taking the subsurface excavation section of municipal engineering tunnel of the international exhibition center in Chongqing as the engineering background, the paper introduces the mono-case retaining wall construction technique, and ensures the construction quality, speed, safety and economic requirements according to the implementation of the construction technique measures, so as to accumulate precious experience for similar projects.
出处
《山西建筑》
2010年第20期325-326,共2页
Shanxi Architecture
关键词
空箱挡墙
隧道
施工
mono-case retaining wall, tunnel, construction