客运专线连续梁一次性整体支架现浇法施工

One-time overall support casting method construction on continuous beam in passenger line
下载PDF
导出
摘要 针对哈大客运专线宫房特大桥跨越公路施工的工程特点,对现浇混凝土连续箱梁一次性整体支架现浇法进行了介绍,具体阐述了施工工艺和安全组织及措施,经实践证明采用一次性整体支架现浇法浇筑连续梁提高了制梁速度、确保了施工工期。 In light of the project characteristics of the construction on Gongfang large Bridge across highway of Ha-Da passenger line, it introduces one-time overall support beam casting method to cast concrete continuous beam, and describes construction technology and sate organizations and measures in detail. Practice shows that: beam-making speeded is increased through adopting one-time overall support casting method to cast continuous beam, and the construction period is also ensured.
作者 赵敏聪
出处 《山西建筑》 2010年第20期329-330,共2页 Shanxi Architecture
关键词 客运专线 连续梁 一次性整体支架现浇法 passenger line, continuous beam, one-time overall support casting method
  • 相关文献

参考文献6

  • 1JGJ166-2008,建筑施工碗扣式脚手架安全技术规范[S].
  • 2JGJ 130-2001,建筑施工扣件式脚手架安全技术规范[S].
  • 3JGJ 15831-2006,钢管脚手架扣件[S].
  • 4JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 5JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 6刘吉士.公路桥涵施工技术规范实施手册[M].北京:人民交通出版社,2001.

共引文献3199

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部