期刊文献+

卡群电站压力前池防冰塞设计与试验研究 被引量:2

Design and experiment research on the fore bay of Kaqun hydropower station to prevent ice block
下载PDF
导出
摘要 通过卡群电站工程实例,研究讨论了引水式电站冬季输排冰运行的条件和电站前池布局的合理性,对引水式电站前池的各关键部位,提出了具体防冰塞措施,并对SL 211-2006水工建筑物抗冰冻设计规范中的若干问题进行了讨论,供设计、研究人员参考。 Through some project examples of Kaqun hydropower station, this paper researches and analysis the conditions for ice sluicing structures of using the diversion canal type of hydroelectric power stations and the layout rationality of power plant fore bay. And it introduces some concrete measures for preventing ice block on the key part of the fore bay of diversion canal type of hydroelectric power stations.. In addition, the author puts forward some own opinions about some issues in the SL 211-2006 Code for design of hydraulic structures against ice and freezing action to provide some references for designers and researchers.
作者 严跃成
出处 《山西建筑》 2010年第20期364-365,共2页 Shanxi Architecture
关键词 压力前池 冰塞 输排冰 流速 pressure fore bay, ice block, ice sluicing, velocity
  • 相关文献

参考文献5

二级参考文献3

共引文献30

同被引文献18

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部